Building Faster Than Before is a free printable Grade 3 to Grade 5 social studies worksheet on raising productivity with capital and training, aligned to Common Core standard D2.Eco.13.3-5. It prints 2 questions with an answer key on its own sheet of paper, in 25 versions that each ask different questions, so no two pupils in the class work from the same page. Print it from the browser or download it as a PDF — no account, no email.
Set 11 of 25 · the same problems every time you open this link.
Set 1 has all 25 in a single PDF. All 25 sets ask different questions.
Building Faster Than Before
D2.Eco.13.3-5
NameDate
Draw a line from each change to what it produced.
1.Draw a line from each one to its match.
Prefabricated sections made in a factory
Surveyors trained inside the council
Standard designs used on every site
A properly kept waiting list
A.Materials can be ordered and delivered in bulk
B.Homes reach the families who should get them first
C.Sites are assessed without waiting for firms
D.A home is assembled in days rather than months
2.Draw a line from each one to its match.
Quarterly figures published nationally
A crane replacing hoists on a tall site
Training returning soldiers as bricklayers
Machine tools supplied under the agreement
A.Delays are found before a whole year is lost
B.Components are made faster than by hand
C.Building upward becomes practical at all
D.More sites can run at once
LessonPrint · D2.Eco.13.3-5 · Set 11 · free to copy for classroom use
Answer key — Building Faster Than Before
Set 11. Prints on its own sheet.
1.1. Prefabricated sections made in a factory — D (A home is assembled in days rather than months) 2. Surveyors trained inside the council — C (Sites are assessed without waiting for firms) 3. Standard designs used on every site — A (Materials can be ordered and delivered in bulk) 4. A properly kept waiting list — B (Homes reach the families who should get them first)
2.1. Quarterly figures published nationally — A (Delays are found before a whole year is lost) 2. A crane replacing hoists on a tall site — C (Building upward becomes practical at all) 3. Training returning soldiers as bricklayers — D (More sites can run at once) 4. Machine tools supplied under the agreement — B (Components are made faster than by hand)
More practice for D2.Eco.13.3-5
Describe how better tools and better skills let people produce more.
Teaching this next? Building Faster Than Before is the 55-minute plan for it, with the misconceptions to expect.