Building Faster Than Before is a free printable Grade 3 to Grade 5 social studies worksheet on raising productivity with capital and training, aligned to Common Core standard D2.Eco.13.3-5. It prints 2 questions with an answer key on its own sheet of paper, in 25 versions that each ask different questions, so no two pupils in the class work from the same page. Print it from the browser or download it as a PDF — no account, no email.
Set 17 of 25 · the same problems every time you open this link.
Set 1 has all 25 in a single PDF. All 25 sets ask different questions.
Building Faster Than Before
D2.Eco.13.3-5
NameDate
Draw a line from each change to what it produced.
1.Draw a line from each one to its match.
Standard designs used on every site
Training returning soldiers as bricklayers
A crane replacing hoists on a tall site
Prefabricated sections made in a factory
A.Materials can be ordered and delivered in bulk
B.More sites can run at once
C.A home is assembled in days rather than months
D.Building upward becomes practical at all
2.Draw a line from each one to its match.
Machine tools supplied under the agreement
Surveyors trained inside the council
A properly kept waiting list
Quarterly figures published nationally
A.Homes reach the families who should get them first
B.Delays are found before a whole year is lost
C.Components are made faster than by hand
D.Sites are assessed without waiting for firms
LessonPrint · D2.Eco.13.3-5 · Set 17 · free to copy for classroom use
Answer key — Building Faster Than Before
Set 17. Prints on its own sheet.
1.1. Standard designs used on every site — A (Materials can be ordered and delivered in bulk) 2. Training returning soldiers as bricklayers — B (More sites can run at once) 3. A crane replacing hoists on a tall site — D (Building upward becomes practical at all) 4. Prefabricated sections made in a factory — C (A home is assembled in days rather than months)
2.1. Machine tools supplied under the agreement — C (Components are made faster than by hand) 2. Surveyors trained inside the council — D (Sites are assessed without waiting for firms) 3. A properly kept waiting list — A (Homes reach the families who should get them first) 4. Quarterly figures published nationally — B (Delays are found before a whole year is lost)
More practice for D2.Eco.13.3-5
Describe how better tools and better skills let people produce more.
Teaching this next? Building Faster Than Before is the 55-minute plan for it, with the misconceptions to expect.