Building Faster Than Before is a free printable Grade 3 to Grade 5 social studies worksheet on raising productivity with capital and training, aligned to Common Core standard D2.Eco.13.3-5. It prints 2 questions with an answer key on its own sheet of paper, in 25 versions that each ask different questions, so no two pupils in the class work from the same page. Print it from the browser or download it as a PDF — no account, no email.
Set 16 of 25 · the same problems every time you open this link.
Set 1 has all 25 in a single PDF. All 25 sets ask different questions.
Building Faster Than Before
D2.Eco.13.3-5
NameDate
Draw a line from each change to what it produced.
1.Draw a line from each one to its match.
Standard designs used on every site
Surveyors trained inside the council
Training returning soldiers as bricklayers
A properly kept waiting list
A.Sites are assessed without waiting for firms
B.More sites can run at once
C.Materials can be ordered and delivered in bulk
D.Homes reach the families who should get them first
2.Draw a line from each one to its match.
Prefabricated sections made in a factory
Quarterly figures published nationally
A crane replacing hoists on a tall site
Machine tools supplied under the agreement
A.Building upward becomes practical at all
B.Delays are found before a whole year is lost
C.A home is assembled in days rather than months
D.Components are made faster than by hand
LessonPrint · D2.Eco.13.3-5 · Set 16 · free to copy for classroom use
Answer key — Building Faster Than Before
Set 16. Prints on its own sheet.
1.1. Standard designs used on every site — C (Materials can be ordered and delivered in bulk) 2. Surveyors trained inside the council — A (Sites are assessed without waiting for firms) 3. Training returning soldiers as bricklayers — B (More sites can run at once) 4. A properly kept waiting list — D (Homes reach the families who should get them first)
2.1. Prefabricated sections made in a factory — C (A home is assembled in days rather than months) 2. Quarterly figures published nationally — B (Delays are found before a whole year is lost) 3. A crane replacing hoists on a tall site — A (Building upward becomes practical at all) 4. Machine tools supplied under the agreement — D (Components are made faster than by hand)
More practice for D2.Eco.13.3-5
Describe how better tools and better skills let people produce more.
Teaching this next? Building Faster Than Before is the 55-minute plan for it, with the misconceptions to expect.