Building Faster Than Before is a free printable Grade 3 to Grade 5 social studies worksheet on raising productivity with capital and training, aligned to Common Core standard D2.Eco.13.3-5. It prints 2 questions with an answer key on its own sheet of paper, in 25 versions that each ask different questions, so no two pupils in the class work from the same page. Print it from the browser or download it as a PDF — no account, no email.
Set 2 of 25 · the same problems every time you open this link.
Set 1 has all 25 in a single PDF. All 25 sets ask different questions.
Building Faster Than Before
D2.Eco.13.3-5
NameDate
Draw a line from each change to what it produced.
1.Draw a line from each one to its match.
Quarterly figures published nationally
Training returning soldiers as bricklayers
Prefabricated sections made in a factory
Standard designs used on every site
A.A home is assembled in days rather than months
B.Delays are found before a whole year is lost
C.Materials can be ordered and delivered in bulk
D.More sites can run at once
2.Draw a line from each one to its match.
Machine tools supplied under the agreement
A crane replacing hoists on a tall site
Surveyors trained inside the council
A properly kept waiting list
A.Building upward becomes practical at all
B.Homes reach the families who should get them first
C.Sites are assessed without waiting for firms
D.Components are made faster than by hand
LessonPrint · D2.Eco.13.3-5 · Set 2 · free to copy for classroom use
Answer key — Building Faster Than Before
Set 2. Prints on its own sheet.
1.1. Quarterly figures published nationally — B (Delays are found before a whole year is lost) 2. Training returning soldiers as bricklayers — D (More sites can run at once) 3. Prefabricated sections made in a factory — A (A home is assembled in days rather than months) 4. Standard designs used on every site — C (Materials can be ordered and delivered in bulk)
2.1. Machine tools supplied under the agreement — D (Components are made faster than by hand) 2. A crane replacing hoists on a tall site — A (Building upward becomes practical at all) 3. Surveyors trained inside the council — C (Sites are assessed without waiting for firms) 4. A properly kept waiting list — B (Homes reach the families who should get them first)
More practice for D2.Eco.13.3-5
Describe how better tools and better skills let people produce more.
Teaching this next? Building Faster Than Before is the 55-minute plan for it, with the misconceptions to expect.